Asphalt Sealing& Striping Overview

Before the property is sealed the perimeter will be edged if necessary, cutting back weeds/grass for a more finished look.  The area will then be cleaned of all debris with power blowers.  Any large oil spots will be cleaned and primed to help prevent breakthrough of the stains.  Once the sealer is applied the entrances will be marked off appropriately so that traffic will not enter the area.  Next a water soluble sealer.  Weather damage, oxidation and the effects of gas, oil and salt are greatly reduced with sealing.  Without sealing, oxidation dries out and deteriorates the asphalt binder.  The pavement loses its flexibility and small cracks develop.  Water and chemicals, etc. are then able to penetrate the surface causing rapid pavement deterioration.

This process can be done by hand with brushes or sprayed on.  One or two coats can be applied.  This is your choice and Fred can help you decide what is best for your particular case.

As soon as the sealer is dry and able to be walked on, usually 2-3 hours depending on the temperature and weather conditions, the stripes can be applied.  Any hash outs, handicap spaces, numbers, etc. will be counted and recorded prior to sealing so that accurate placement will occur once the lot is sealed.  Any changes to the configuration of the striping should be discussed with Fred prior to the estimate.

About Us   |   Residential   |   Commercial   |   Asphalt Patching   |   FAQs   |   Contact Us   |   Home
© North Coast Sealing